Projects

Woodland Avenue

Current Project

Extension

Extension

Renovation

Renovation

Located near the sea in Southbourne, Woodland is a substantial property currently undergoing an exciting transformation. This ongoing project features a large-scale extension designed to accommodate a double-storey garage and a luxurious guest suite, expanding both functionality and living space. In addition, an underground wine cellar is being constructed, adding a unique and sophisticated touch to the home. Once complete, Woodland will offer a perfect blend of coastal charm, modern convenience, and exceptional bespoke features, making it an impressive retreat by the sea.

  • Building under construction with scaffolding around it, showing brick and concrete walls, windows, and sliding glass doors.

  • Backyard construction site with scaffolding on the left, an unfinished structure with large windows or doors in the center, brick and concrete walls, and a green leafy tree on the right.

  • A house under construction with scaffolding, unfinished brick walls, and a bicycle parked outside on a dirt yard.

  • Interior of a room under renovation with exposed brick wall, sliding glass door, and recessed ceiling lights.

  • An interior of a room under construction, with unfinished walls, uncovered flooring, and a large sliding glass door leading outside. Construction materials and tools are visible, with yellow protective tape along the base of the walls.

  • Interior of a room under construction with black cabinet units, a work stool, and a person installing items, with ceiling lights and a skylight.

  • Interior of a room under construction with black cabinets and unfinished walls.

  • Wooden staircase under construction inside a room with unfinished walls.

  • Interior room under construction with unfinished walls, ceiling lighting, and large sliding glass doors on the right side.

  • Unfinished attic room with sloped ceiling, a window at the end, and wires hanging from the ceiling. Wooden framing for a staircase without steps on the left, and drywall partially installed.

  • An attic or upper room under construction with sloped ceiling, unfinished drywall, exposed wiring, and a black trash bin. There are two open doorways and some construction materials, including a piece of fabric or insulation on the floor.

Contact us.

nick@causewayconstruction.co.uk

07702795054

Read our Privacy Policy for details on how we handle your data.